Quickmast 108
Previous product
Next product
Quickmast 341
 

Quickmast
110

POLYURETHANE RESIN BASED INJECTION SYSTEM
 
Advantages:
  • Excellent bond strength to concrete, brickwork, and masonry

  • Low viscosity polyurethane resin, formulated to allow cracks penetration

  • Rapid reaction with water; will stop water leakage problems

  • Outstanding resistance to hydrostatic pressure

  • Used with Quickmast 120 to form permanent elastic seal

  • Exhibit good chemical resistance
  • Non-toxic, suitable for use in contact with potable water
Description:

Quickmast 110 is a two component; low viscosity moisture reactive polyurethane system which when reacts with water and expands to form a closed cell foam barrier.

Usage

For injection of wet cracks in all types of structural concrete elements, masonry, and brickwork.

Quickmast 110 is used in conjunction with Quickmast 120 for permanent and effective sealing of live cracks. Quickmast 120 is flexible resin with unique physical properties such as:

60 - 80 % elastic properties and 2 MPa tensile strength.


Materials Supplied

Quickmast 110 is available in 1 and 5 l packs

Storage/ Shelf Life

Quickmast 110 has a shelf life of 12 months from date of manufacture if stored at temperatures between 10 and 30oC in dry conditions and original sealed containers.

If these conditions are exceeded, DCP Technical Department should be contacted for advise.


Standard


Quickmast 110 is suitable for use in contact with potable water when tested in accordance to BS 6920.


Technical Information

Reaction time with water
Between 5 – 30 sec
Pot life in absence of water
3 - 4 h @ 25°C
2 - 3 h @ 35°C
Mixed density1.12 ± 0.05 g/cm³
Viscosity
200 – 350 mPa.s @ 25°C
100 – 200 mPa.s @ 35°C

The technical data are specified at 25 ° C.

Application Information

Depending on crack width, depth, location, and thickness of the structural element that needs to be injected, many injection techniques requiring different injection tools and equipment may be used. The method of injection given in this Technical Data Sheet is based on most common situation. For more details, DCP Technical Department should be consulted for assessments and advice.


SUBSTRATE PREPARATION
The surface of the cracks should be cleaned from dust, oil, plaster, grease, curing compound and corrosion deposits. All cracks to be repaired should be cleaned with compressed air. This should be carried out after drilling of injection holes.

Injection Holes Drilling & Fixing
Holes are drilled to install mechanical packers. Always try to allocate steel re-bars and conduit before drilling.
Using high quality rotary hummer drill, and depending on packer diameter used, a suitable drill pit used, usually  13 mm or 16 mm diameter mechanical packers are used.
The angle which drilling should be is 45⁰C or less to the surface and toward the crack. Depth of the drill holes intersecting the crack should be somewhat close to middle of structure, if possible.
Holes greater than 45 cm are not required even if the concrete being repaired is more than 90 cm thick. Holes should always be staggered from one side of the cracks to the other.

Spacing: distance between drilled holes usually varies from approximately 15 – 50 cm according to width of the cracks (30 cm is commonly used). Yet the wider the cracks, the further apart are drill holes.


Note:
If concrete thickness 15 cm or less, do not attempt angle drilling. Also to minimize concrete spalling, packers will be set into the face of the crack.

Fixing of Injection Mechanical Packers (Nipples)
Packers shall be placed in drill holes so that top of the rubber sleeve is below concrete surface. Tight the packer with wrench as much as you can.

Injection
Mix Quickmast 110, resin and accelerator using mechanical slow speed drill.
Load the mixed resin and charge the pump, hose and gun.
When injecting into a defined crack, the crack surfaces between two mechanical packers exhibits immediate free flow of resin while working the first packer, pause for few minutes, in most cases the foam of Quickmast 110 will react fast enough with water and expand rapidly to close these cracks, and the cured Quickmast 110 will heal the crack and provide surface seal to contain the material to flow. After 2 - 3 min , start pumping again.

If the crack between the packers did not heal, then apply Setplug a fast cure water plug. Begin injection at point of highest resistance to ensure good penetration and minimal loss of materials.

The injection is usually starts at the lowest point on vertical crack and at the narrowest area on horizontal surface.
Injection process will continue until  the mixed resins (Quickmast 110) travelled to next packer. Disconnect and move to next packer.
After completing two packers, return to first packer and inject again. Continue with this fashion until crack is completely filled.
Immediately and after water flow stoppage, inject the crack/ honeycombing with a mixed (part A & B) resin using Quickmast 120 to permanently seal the crack/ honeycombing.





Download file



Related products




How to





Connect with Don Construction Products


Name *
Email *
Phone
Address
Reason
Request  
Security Code *
Don Construction Products Bulgaria EAD

Sales office

Monday - Friday: 9:00 - 17:30

Sofia 1582, Bulgaria
152 Prof. Tsvetan Lazarov blvd.
Techno Park Sofia
Tel.: +359 2 870 2782; +359 2 870 2761

info.bulgaria@dcp-int.com

Technical support

+359 2 870 27 82

Contact form

Get Contact Form